OpenProject MCP Server for AI Integration - Production Ready v0.0.1
This server exhibits significant gaps in definition quality across all dimensions. Tool naming follows the verb_noun pattern (list-, get-, generate-), which is acceptable, but descriptions are thin and lack LLM-optimized guidance. Input schemas are present for all tools but severely under-specify constraints, parameters lack enums, format restrictions, and detailed descriptions. No output schemas are documented. The most critical issue is that the `generate-weekly-report` tool lacks required parameters (week_start and week_end), creating an ambiguous interface. Error handling is not visible in the provided code. Five tools is a small, manageable set, but the lack of depth in descriptions and parameter constraints significantly limits LLM ability to select and invoke tools correctly. The tool descriptions (avg ~45 chars) fall well below the production baseline of 194 chars, and parameter descriptions are missing or perfunctory.
Generate weekly report for a project
Get project details by ID
Get work package details by ID
List OpenProject projects
List work packages in a project
Tool descriptions are extremely brief (20 - 45 chars) and lack LLM-optimization guidance. Descriptions should explain WHAT the tool does, WHEN to use it, and any prerequisites. Current descriptions provide no such detail.
Parameters lack meaningful descriptions. The 'limit' parameter appears in list-projects and list-work-packages but has no guidance on valid range (e.g., 1 - 100), default value, or behavior when exceeded. The 'week_start' and 'week_end' parameters in generate-weekly-report mention 'YYYY-MM-DD format' but do not explain whether dates are inclusive, if they must be sequential, or what happens if end < start.
No output schemas are documented anywhere in the provided code. The tool definitions show only input schemas. LLMs cannot plan downstream calls or extract the right data without knowing what fields each tool returns. This violates the baseline that 100% of A+ tools have documented return types.
Inferred effective spec: <=2025-11-25.
| Scored | Grade | Overall | Spec posture | Rubric |
|---|---|---|---|---|
| 2026-09-22 | F | 38 | <=2025-11-25 | v2 |
| 2026-03-09 | F | 42 | - | v1 |
generate-weekly-report has two parameters (week_start, week_end) that are not in the 'required' array, yet semantically they should be required for the tool to function. This creates ambiguity: does the tool use the current week if dates are omitted? Defaults that are not explicit are error-prone.
Input parameters for numeric types (project_id, work_package_id, limit) have no min/max bounds or validation hints. The 'limit' parameter could theoretically accept 1000000, which could timeout or exhaust server resources. Production tools bound numeric parameters.
No error handling guidance is visible. If a project_id does not exist, does the tool return a 404? An empty list? An error message? The LLM has no recovery path documented.
No tool annotations (readOnlyHint, destructiveHint, idempotentHint) are declared, though the risk field indicates all tools are READ_ONLY. These should be surfaced as tool annotations so clients can apply appropriate guards.