Multi-server MCP implementation for Smart Grid transformer asset operations, diagnostics, and maintenance. Includes IoT telemetry, failure mode analysis, time-series forecasting, and work order management.
19 tools with consistent verb-noun naming (list_, get_, create_, update_, search_, forecast_, detect_, trend_, estimate_). All tools have descriptions (avg ~80 chars, within baseline 34-392). Input schemas present with type definitions and parameter descriptions. However, output schemas are NOT documented, critical gap for LLM planning. No tool annotations (readOnlyHint/destructiveHint). Error handling guidance absent. Parameter constraints (enums for priority, status, severity) present but inconsistently applied. Missing: output field documentation, error recovery guidance, and confirmation patterns for destructive ops (create_work_order, update_work_order).
Classify a set of gas concentrations into a fault type using the IEC 60599 Rogers Ratio method.
Create a new maintenance work order for a transformer.
Detect anomalous sensor readings using a rolling z-score method.
Estimate repair downtime based on fault type and severity.
Project the RUL forward by `horizon_days` using a linear degradation model.
Return full nameplate and status metadata for a single transformer.
Retrieve the most recent dissolved gas analysis (DGA) record for a transformer.
Output schemas not documented. LLMs cannot plan downstream tool calls or extract required fields (e.g., what fields does list_assets return? Does get_sensor_readings include timestamps?). Critical for multi-step reasoning.
No tool annotations (readOnlyHint, destructiveHint, idempotentHint). Agents cannot distinguish safe reads from destructive writes without explicit hints. create_work_order and update_work_order should be marked destructiveHint=true.
| Scored | Grade | Overall | Spec posture | Rubric |
|---|---|---|---|---|
| 2026-09-23 | C | 65 | 2026-07-28+ | v2 |
Retrieve a single historical fault record by its ID.
Return the most recent remaining useful life (RUL) estimate for a transformer.
Return the sensors and gases most strongly associated with a failure mode.
Return time-series readings for one sensor on one transformer.
List all Smart Grid transformer assets.
Return the full catalogue of known transformer failure modes.
Browse historical fault records from the Smart Grid dataset.
List all sensor IDs available for a given transformer.
List work orders created by the agent in this session.
Search failure modes by keyword (name, description, gas, or IEC code).
Compute the trend (slope) of a sensor's readings over a time window.
Update an existing work order's status, priority, assignee, or add a note.
No error recovery guidance. Descriptions lack 'what to do if this fails' hints. E.g., get_sensor_readings should document: 'If sensor_id is invalid, call list_sensors() first.' Missing recovery patterns force agents to guess.
Destructive operations (create_work_order, update_work_order) lack confirmation or dry-run patterns. Agents can create/modify work orders without explicit user approval, risking unintended maintenance scheduling.
Parameter descriptions lack format/constraint details. E.g., 'start_time' and 'end_time' in get_sensor_readings say 'ISO-8601 datetime string' but do not specify timezone handling, precision (seconds vs milliseconds), or whether null means unbounded. Ambiguity invites invalid input.